References
100 PE Sharjah,UAE
KLARO delivered a 100 PE KLARO One wastewater treatment plant to the United Arab Emirates.
The plant is used to treat wastewater from the Ministry of Energy and Infrastructure in Sharjah.
In order to be able to use the treated wastewater for the irrigation of the green areas, an e-chlorination module was installed downstream of the plant, which disinfects the wastewater once again.
The machine technology was installed in an outdoor cabinet, so the system runs perfectly even at extreme temperatures of up to 50°C.

Plants (51-5000 PE) - Office building
Sharjah, United Arab Emirates
Success can be measured
KLARO in numbers
- You can count on us.
950.000+
Users worldwide
80+
In over 80 countries
30
Specialists in Bayreuth