References
15 PE Mountain Refuge, Switzerland
Facts
| Size | 15 PE - 2,25 m³ per day |
|---|---|
| Location | Wallis in Switzerland |
| System | KLARO |
| Area of application | Mountain refuge |
| Type of wastewater | Domestic |
Project overview:
Even mountain huts on the highest peaks cannot simply dispose of their wastewater in nature. To find a suitable solution, it is crucial to choose a plant that can be transported to the site by a means other than a truck. Often, the roads to the huts are narrow and impassable. This is where we come in: our CARAT tanks offer a comparatively lightweight wastewater treatment plant that can be easily transported by helicopter – as we have already successfully implemented in Switzerland.
Solution with KLARO wastewater treatment plants:
- KLARO complete system in two carat tanks
- Designed for 15 PE, 2.25 m³ per day
- Clarification tanks were flown to the site
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth