200 PE Municipality, Portugal
Facts
| Size | 200 PE - 30 m³ per day |
|---|---|
| Location | Porto in Portugal |
| System | KLARO Container.Xtra |
| Area of application | Municipality |
| Type of wastewater | Domestic |
Project overview:
A 20-ft container was installed at a municipal wastewater treatment plant in Portugal to treat a specific part of the wastewater flow. The wastewater is pumped from an underground tank into the container, which serves as a bioreactor and ensures the desired effluent values. The KLARO WebMonitor was also integrated so that the system can be monitored remotely at any time.
Solution with KLARO wastewater treatment plants:
- Mobile wastewater treatment plant in a 20-foot container
- KLARO Container.Xtra concept
- Designed for 200 PE, 30 m³ per day
- Additional KLARO WebMonitor for remote maintenance of the plant