200 PE Hotel, Germany

Facts

Size200 PE - 30 m³ per day
LocationWalchensee in Germany
SystemKLARO
Area of applicationHotel
Type of wastewaterDomestic

Project overview: 

The village of Walchensee, with around 600 inhabitants, needed a new wastewater treatment plant. After years of discussions about the best method for treating wastewater, the decision was finally made in favour of a decentralised solution from KLARO. 

The decisive factor was our transparent cost structure, which enabled every citizen to see all costs incurred from the outset.
In addition, the local Gasthof zur Post had to be modernised. The limited space, the seasonally fluctuating wastewater volumes and high cleaning requirements posed particular challenges for the system.

Solution with KLARO wastewater treatment plants:

  • Two-line KLARO complete system
  • designed for 200 PE, 30 m³ per day
  • installed in 4 concrete tanks
  • Additional dosing technology for P-precipitation and a UV module for further wastewater treatment

We provide clear water. Worldwide.

Discover more references. Click on a marker on the globe to learn more.

Success can be measured

KLARO in figures
- You can count on us.

1.500.000+

User worldwide

80+

In over 80 countries

35

Specialists in Bayreuth