3 PE Animal Shelter, Germany
Facts
| Size | 3 PE - 0,45 m³ per day |
|---|---|
| Location | Bockau in Germany |
| System | KLARO One UP |
| Area of application | Animal shelter |
| Type of wastewater | Domestic |
Project overview:
Animal shelters also need a suitable wastewater treatment solution, usually for only small volumes of wastewater such as water from staff kitchens and toilets. Since the rocky subsoil meant that it was not possible to dig a pit, the decision was taken to use the compact KLARO One UP. This system fits into even the smallest of spaces and still treats the wastewater efficiently.
Solution with KLARO wastewater treatment plants:
- KLARO One UP complete system
- Designed for 3 P.E., 0.45 m³ per day
- Installed in a narrow adjoining room
- With a metal interior cabinet for wall mounting