Contact

References

300 PE, Campground, Scotland

Facts

Size300 PE - 45 m³ per day
LocationAberdeenshire in Scotland
SystemKLARO
Area of applicationCampground
Type of wastewaterDomestic

Project overview: 

The Caravan Park in Scotland, a popular campsite with additional overnight accommodation in holiday homes, is planning to expand its capacity and was therefore looking for a wastewater treatment solution that can flexibly keep pace with the park's growth. The KLARO system proved to be the ideal choice. We developed a three-stage system that can be gradually expanded from a treatment capacity of 300 PE to 600 PE and finally to 900 PE. All primary settlement tanks were connected to each other, while the SBR tanks of the three stages can be operated independently of each other for maximum flexibility.

Solution with KLARO wastewater treatment plants: 

  • KLARO complete system pre-assembled in Carat XXL tanks
  • Designed for 300 PE, 45 m³ per day
  • Technology installed in a large outdoor cabinet

We provide clear water. Worldwide.

Discover more references. Click on a marker on the globe to learn more.

Success can be measured

KLARO in figures
- You can count on us.

1.500.000+

User worldwide

80+

In over 80 countries

35

Specialists in Bayreuth