320 PE Worker Camp, Qatar
Facts
| Size | 320 PE - 48 m³ per day |
|---|---|
| Location | Al Khor in Qatar |
| System | KLARO |
| Area of application | Worker camp |
| Type of wastewater | Domestic |
Project overview:
From wastewater to irrigation – that was the goal of the operators of a labour camp in Qatar. A massive above-ground rectangular tank was constructed on site, and a suitable treatment system was sought for it. In order to use the treated wastewater for irrigation, it had to be processed in such a way that almost all germs were eliminated. The flexible KLARO system was therefore chosen, which offered the ideal solution due to its flexibility and numerous expansion options.
Solution with KLARO wastewater treatment plants:
- KLARO kit installed in concrete pit on site
- Designed for 320 PE, 48 m³ per day
- Mechanical equipment in machine house next to the plant
- Sand filter unit and additional chlorination