References
36 PE Air Force, Colombia
Facts
| Size | 36 PE - 5,4 m³ per day |
|---|---|
| Location | Colombia |
| System | KLARO One UP |
| Area of application | Communication station air force |
| Type of wastewater | Domestic |
Project overview:
At an altitude of over 3,600 metres, there is an air force communications station in Colombia. Here, too, wastewater is produced by the employees, but the local conditions are unsuitable for underground construction, so that the installation of a conventional wastewater treatment plant is not possible. Therefore, a compact, above-ground sewage treatment solution was sought. The choice fell on the KLARO One UP plant, which impressed with its high-performance wastewater treatment system in compact plastic tanks and could be ideally adapted to the special requirements on site.
Solution with KLARO wastewater treatment plants:
- KLARO One UP complete system in five plastic tanks
- Designed for 36 PE, 5.4 m³ per day
- Two metal indoor cabinets for wall mounting
- Additional e-chlorination for further wastewater treatment
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth