References
4 PE Residential building, Brazil
Facts
| Size | 4 PE - 0,6 m³ per day |
|---|---|
| Location | Joinville in Brazil |
| System | KLARO |
| Area of application | Single family house |
| Type of wastewater | Domestic |
Project overview:
In a detached house in Brazil, a small above-ground wastewater treatment plant was installed for four residents. Ventilation is provided by a pipe that runs under the roof, while the EPP cabinet is mounted directly on the wall next to the plant. The tropical climate does not affect the function of the small wastewater treatment plant in any way, ensuring reliable and efficient wastewater treatment.
Solution with KLARO wastewater treatment plants:
- KLARO retrofitting for existing above-ground tanks
- Designed for 4 PE, 0.6 m³ per day
- Machine technology in a high-quality PP-cabinet for wall mounting
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth