533 PE Brewery, Italy
Facts
| Size | 533 PE - 79,95 m³ per day |
|---|---|
| Location | Sommatino in Italy |
| System | KLARO |
| Area of application | Brewery |
| Type of wastewater | Domestic & industrial |
Project overview:
The wastewater from breweries is often heavily contaminated with yeast, hops and spent grains and reaches temperatures of over 30°C during the brewing process. The challenge is to prevent the wastewater from continuing to ferment. But the KLARO systems also effortlessly master this task.
Solution with KLARO wastewater treatment plants:
- Two-line KLARO sewage treatment plant in six on-site concrete tanks
- Designed for 533 PE, 79.95 m³ per day
- Mechanical equipment in a purpose-built machine room
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth