References
70 EW Office building, Pakistan
Facts
| Size | 70 EW - 10,5 m³ pro Tag |
|---|---|
| Location | Lahore in Pakistan |
| System | KLARO One |
| Area of application | Bürogebäude |
| Type of wastewater | Domestic |
Project overview:
In Lahore, Pakistan, a KLARO One system for 70 PE was installed in a locally manufactured concrete tank for efficient wastewater treatment in an office building. A separate machine room was built right next to the system to house the KLARO machine technology. This is supplemented by an E-chlorination system, which further improves the treatment results. The treated wastewater can then be used for irrigation without any problems.
Solution with KLARO wastewater treatment plants:
- KLARO One new installation in on-site concrete tank
- Designed for 70 PE, 10.5 m³ per day
- M-tech for separate machine room
- KLARO e-chlorination for further wastewater treatment
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth