References
8 EW Residential buildings, Germany
Facts
| Size | 8 PE - 1,2 m³ per day |
|---|---|
| Location | Boppard in Germany |
| System | KLARO One UP |
| Area of application | Residential buildings |
| Type of wastewater | Domestic |
Project overview:
A KLARO One UP small wastewater treatment plant was installed as an above-ground indoor solution for two neighboring residential buildings in the narrow valley of Weilerer Mühle. Due to the difficult terrain—steep slopes, a stream, and rocky ground—earthworks were not economically viable. The compact and maintenance-friendly solution could be implemented entirely in the basement rooms.
Lösung durch KLARO Kläranlagen:
- KLARO One UP Complete system in three 2,000 L plastic tanks
- Designed for 8 PE, 1.2 m³ per day
- Technical components in a high-quality PP inner cabinet
- Additional C module for carbon dosing
Image source: Weilerer Mühle, Fey in Boppard
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth