References
80 PE Restaurant, Netherlands
Facts
| Size | 80 PE - 12 m³ per day |
|---|---|
| Location | Enschede in the Netherlands |
| System | KLARO |
| Area of application | Restaurant |
| Type of wastewater | Commercial |
Project overview:
In the Dutch city of Enschede, there was an urgent need for a wastewater treatment plant that could efficiently and reliably treat the wastewater from a restaurant. As the daily wastewater volumes generated in the catering industry can fluctuate greatly - from very small quantities to large peak loads during peak times - the focus was on selecting a system that could react flexibly to these varying volumes.
Solution with KLARO wastewater treatment plants
- KLARO complete system in 4 concrete tanks
- Designed for 80 PE, 12 m³ per day
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth