300 PE Golf Hotel, Luxembourg
Facts
| Size | 300 PE - 45 m³ per day |
|---|---|
| Location | Luxembourg |
| System | KLARO Container |
| Area of application | Golf hotel |
| Type of wastewater | Commercial |
Project overview:
The connection to the local sewer system was delayed, but the hotel was supposed to start operating – so where should the wastewater go? This was the challenge facing a golf and spa hotel in Luxembourg. Although everything was ready, the functioning sewer system was missing. The idea: an uncomplicated interim solution. Our mobile wastewater treatment plant proved to be ideal because, thanks to its high flexibility, it can be adapted to any situation and, thanks to plug-and-play, it can be quickly and easily installed on site.
Solution with KLARO wastewater treatment plants:
- Mobile sewage treatment plant in 2 x 40-foot container
- Designed for 300 PE each, 45 m³ per day
Success can be measured
KLARO in figures
- You can count on us.
1.500.000+
User worldwide
80+
In over 80 countries
35
Specialists in Bayreuth