References
100 PE Community, Switzerland
Facts
Size | 100 PE - 15 m³ per day |
---|---|
Location | Presinge, Switzerland |
System | KLARO Container |
Area of application | Community |
Type of wastewater | Domestic |
Project overview:
The village of La Louvière is located on the border with France, which previously made a sewage connection to Switzerland impossible. In the 1970s, the village was equipped with a small trickling filter sewage treatment plant. However, this plant no longer fulfils the required discharge values and is also very outdated. As it is also located on private land, its accessibility also makes it difficult to maintain and repair the plant. Various options therefore needed to be examined in order to find a suitable solution. After a thorough investigation, it was finally decided to connect the hamlet to the French wastewater network. During the connection work, a KLARO container will temporarily take over the wastewater treatment.
Solution with KLARO wastewater treatment plants:
- Mobile wastewater treatment plant in a 20-foot container
- Designed for 100 PE each, 15 m³ per day
Success can be measured
KLARO in numbers
- You can count on us.
1.000.000+
Users worldwide
80+
In over 80 countries
30
Specialists in Bayreuth